Serving UAE, GCC & Africa Design · Supply · Installation · Relocation

Jracking CE Certified Industrial Shelving Warehouse Racks Heavy-Duty Cantilever Racking System for Car Storage

Product Description

Cantilever Racking Overview
Cantilever Racking Specifications
Product Specifications
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Product & Component Details
Component Detail 1
Component Detail 2
Component Detail 3
Component Detail 4
Installation Guide
Step 1
Step 1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Step 2
Step 2

Position the column (1) vertically into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M.

Step 3
Step 3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Step 4
Step 4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts (7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors (11). Firmly bolt the fastening plate in place. Recommended torque: 50 NM.

Step 5
Step 5

The arm (12) is fastened to the column (1) using safety pins Ø29x140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Step 6
Step 6

Finally, the completed structure should look like the illustration.

Manufacturing & Project Gallery
Gallery 1
Gallery 2
Gallery 3
Gallery 4
Gallery 5
Gallery 6
Gallery 7
Gallery 8
Gallery 9
Product Categorization
Frequently Asked Questions (FAQ)
Q What are your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally in 20-25 days after deposit received.
3) Sample policy: Samples are always available for each model and can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: We offer good discounts for large quantities.
Q How can my goods be delivered?
1) Sea freight: We will update sea freight rates once we know the destination sea port where goods will be delivered.
2) Agent designated by client: Please provide the contact details of your shipping agent, and we will arrange the delivery accordingly.
Q What kind of services do you offer?
1) Inquiries related to products or pricing will be replied to within 12 hours.
2) Well-trained and experienced staff to answer all inquiries in fluent English.
3) OEM & ODM support; we assist in designing custom racking structures.
4) Highly experienced professional engineers available to provide optimal storage solutions.
Q What is the ordering process to purchase your products?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
Q What are your key advantages?
1) Flexible Payment: O/A 40-60 days available.
2) Fast Lead Time: Rush orders supported with rapid delivery.
3) Factory Price: Competitive direct factory pricing.
4) Reliable Warranty: Two years warranty; replacement parts will be provided and delivered.
Q Does Jracking have an MOQ limitation, and how are tooling fees handled?
MOQ: No strict MOQ limitation, but higher order quantities yield better pricing. We recommend ordering at least one 20ft container (approx. 15 tons) for regular products.
Tooling Fee: If new mold production is required, tooling costs are charged before the first order and will be partially or fully refunded once orders reach a designated quantity.

Related Products